Extension of the existing 20.7 km. LRT Line 1 by approximately 11.7 km. from Baclaran to Bacoor including the initial Rolling Stock (55 train sets).
Eight (8) passengers stations with a provision for two (2) additional stations; one (1) satellite depot and three (3) Intermodal facilities.
Operations and Maintenance Concession of the integrated line with systems enhancement works throughout the concession period.
Estimated Project Cost :
Base on PPP Forum
Total Project
Cost
Public Private Partnership (PPP) (Proposed financing scheme)
USD 1,281,785.59
Source: PPP-PE Form No.2
STATUS OF THE PROJECT (as of January 31, 2012)
For the selection of Consultants for the preparation of the Environmental Impact Assessment(EIA), which is a requirement for the renewal of Environmental Compliance Certificate (ECC),the Notice of Award(NOA) was issued to Berkman International, Inc. on January 13, 2012.
Phase 1 Contract which includes the Site Grading, Construction of Fence and Slope Protection was completed on April 30, 2010.
Phase 2 Contract which involves Roads and Water System, Drainage System and Construction of 180 housing units for resettlement is 100% completed as of July 31, 2011.
Phase 3 Contract which involves the construction of the remaining 1,820 housing units will be started as soon as LRTA has transferred the additional amount of P456,601,600. This amount is based on the estimated P250,880.00 per unit following the prescribed design of the Province.
Acquired 79% of the required 255,507 sqm of private and public lots for the Right of Way (ROW). Negotiation with the private property owners is on-going.
The DBM released theNotice of Cash Allotment (NCA) amounting to P1.556 B in December 22, 2011 for the Right of Way Acquisition and other requirements.
SUMMARY OF PRIVATE PROPERTIES as of January 31, 2012
STATUS
PARAÑAQUE (SQM)
LAS PIÑAS (SQM)
CAVITE (SQM)
TOTAL
%
AREA
LOTS
PRIVATE
UNDER NEGOTIATION
8,725
-
208
8,933
3
3.50%
EXPROPRIATION FOR FILING
975
1,511
1,171
3,657
5
1.43%
EXPROPRIATION FILED
14,671
5,650
21,709
42,030
35
16.45%
TOTAL
24,371
7,161
23,088
54,620
43
21.38%
POSSESSION (w/o Title)
12,281.80
2,036
12,231
26,548.50
31
10.39%
POSSESSION (w/Title)
23,983
0
78,468
102,451
16
40.10%
TOTAL (PRIVATE)
60,635.80
9,197
113,787
183,619.50
90
71.87%
TOTAL (GOVERNMENT)
39,498
14,746.23
17,433
71,887.23
111
28.14%
GRAND TOTAL
100,134
23,943
131,220
255,507
201
100%
PHYSICAL POSSESSION LRTA
PRIVATE
130,647.50
51.13%
GOVERNMENT
71,887.23
28.14%
TOTAL
202,534.70
79%
TARGET IMPLEMENTATION SCHEDULE:
ACTIVITY
DATE
NEDA Approval
February 2012
Bidding Process
March - November 2012
Expected Date of Award/ Effectivity
December 2012
Start of Construction (Phase 1)
April 2013
Start of Construction (Phase 2)
April 2015
Commissioning Phase 1(Baclaran to Dr. Santos Ave. Station)
June 2015
Commissioning Phase 2(Dr. Santos Ave. Station to Niyog Station)
June 2017
For more information
Please Contact:
ENGR. DANILO S. TOLENTINO
Project Manager
Tel. # +63(2)854-0980 or at
Tel. # +63(2)853-0042 local 8361
Fax # 8540980